Building Valley House Brewing Co.

Pretty tanks
Getting the tanks aligned
More tanks arriving
Pretty tanks
Getting the tanks aligned
More tanks arriving
Pretty tanks
Getting the tanks aligned
More tanks arriving
Pretty tanks
A brewer getting new tanks
Tanks arriving
Tap room
The finished floors
Bathroom Hallway
Ready for tanks
Coldbox came with signs
Lucky visitor
Surfacing the floors
Continueing to paint the tap room
Painting the tap room
Adding Drywall
Insulating the tap room
Brewhouse with no second fllor
Framing from the brewhouse view
Framing the Walls
Then a whole lot of cement
Then a layer of gravel
Just cover that up with double rebar
Ground plumbing
Our brewer installing trench drains trenches, with love
These drains run deep
Our brewer digging deeper trenches, with love
Our brewer digging trenches, with love
Digging out trenches for ground plumbing
Making piles of dirt
Taking out the old concrete floor
A new sidewalk
Pulling down the old stairs and leaving a door to nowhere
Pile of debris from demolition
New Doors wtih Brewer Reflection
Original view of the building